Institut Lumière
Lyon, France
2023 Cultural
Renovation of cinemas theaters in the historic house of the Lumière family, the project begins with a excavation of the floor to restore height in the hall and theaters, make bleachers, redistribute the whole to slightly increase the overall gauge of 140 seats into two equivalent rooms, make accessible to everyone the rooms and the museum, install a nice air conditioning, create direct access for operation parallel to the opening hours Work in 8 months, to open for the next festival Lumière 2023 !.
Renovation of the cinema in the basement of the house of Lumière family
Client:
Institut Lumière
Architect & Economist:
Atelier Architecture Lalo
Schedule manager: GCI
Structural engineering:
Be Concret
Fluids engineering:
Innovation Fluides
Acousticien: AAB
Photographies :
Michel Denancé
Area: 320 m²
Entreprises : Demopur, ABC, R’Cube, ATP, D3A, Atelier Bois, SPIE, SET, HTI, Kleslo, Comptoir des Revêtements, AC Carrelage, TK, La Cabinerie, Cin’equip.
Delivery: Septembre 2023
Delivery: sept 2023