Le César Cinema
Marseille, France
Current - 2019 Cultural
The project proposes a complete restructuring of the establishment, integrating the audio-visual standards of the current cinemas. This redevelopment plans to make the 3 rooms accessible to persons with reduced mobility, as well as the creation of spaces of conviviality for the public. Lastly, on the floor above the hall, behind the façade overlooking Place Castellane, the offices will be transformed into a space dedicated to multimedia and with offices for mezzanine staff.
Client:
Cinéma Le César SARL
AAL Project Manager:
Mehdi Cheriaa
Structural ingineering:
ENGINEERING 84
Fluids ingineering:
LABO
Economist:
AE75
Acoustic enginering:
AAB
Control office:
Qualiconsult
Polls ingineering:
GINGER BTP